One price, several visits, and a clear line about where our job ends and a roofer's begins.
The whole trapping programme: inspection, trap placement, repeat monitoring visits, humane dispatch, removal of the animal, and a written account of the entry points with proofing advice.
Not included: roofing work, insulation replacement or electrical repair. We find the hole; a roofer closes it.
| Stage | What happens |
|---|---|
| Visit 1 | Inspection of the roof space and external elevations. Identification. Entry points found and recorded. Traps placed. |
| Visit 2 | Traps checked and reset. Any animal removed. Activity reassessed. |
| Further visits | Repeated until the roof space is confirmed clear. Typically one to three weeks in total. |
| Final | Confirmation the space is clear, and written proofing advice for a roofer. |
The number of visits is driven by the animal, not the invoice. £280 covers the programme however many that takes.
A good proportion of squirrel enquiries turn out to be rats, and a smaller proportion turn out to be nesting birds. Those are entirely different jobs at different prices.
See our full squirrel control service, the £280 fixed price and what the programme covers.
View Squirrel Control Wealdstone →Being clear about this is worth more than a vague promise.
| Task | Who |
|---|---|
| Identify the animal | Us |
| Trap, monitor, remove | Us |
| Find and record the entry points | Us |
| Advise what to close and when | Us |
| Replace a lifted tile or rotten fascia | Roofer |
| Fit soffit or eaves mesh at height | Roofer |
| Replace fouled insulation | Insulation contractor |
| Repair gnawed cabling | Electrician |
We do not carry out work at roof height. Saying so upfront is more useful than discovering it halfway through.
The single most important sequencing point in a squirrel job.
The right order is trap, confirm clear, then close. Any other order creates a second problem.
Squirrels have two breeding periods, roughly late winter to early spring and midsummer. A drey in a roof space in those periods is likely to contain young, which changes both the timing and the approach. Mention when the noise started — it helps.
In a converted house or a purpose-built block, the roof void is often not part of any individual flat.
That document is what you hand to a roofer, a landlord or a managing agent.
Usually one to three weeks from first visit to confirmed clear.
We need loft access. Arrangements can usually be made.
If the entry point was not closed, it will. That is the argument for doing the roofing work promptly.
We find wasp nests in roof spaces constantly — treatment is £90 fixed in Wealdstone, guaranteed.
Inspection, trap placement, repeat monitoring visits, humane dispatch, removal, and written proofing advice.
However many it takes — typically one to three weeks from first visit to confirmed clear.
No. Roof-level work is a roofer's job. We identify and describe the entry points in writing.
Only once the roof space is confirmed clear. Closing it early traps the animal inside.
Sealing a mother out leaves dependent kits inside. Tell us when the noise started so we can allow for it.
We tell you and price it as a rat job. A good proportion of squirrel enquiries are rats.
Check your lease and raise it with the freeholder or managing agent. We can deal with an agent directly.
Yes — what was found, where the entry points are and what needs closing, for a roofer or landlord.
£280, however many visits it takes. Written proofing advice for your roofer at the end.
Prefer to talk? Call 0203 151 6640 or WhatsApp us.